Project Completed
Permanent
building for Primary Health Care Center
As our first project, we are erecting a permanent building
for a primary health care center in Iyankankulam, Mullaitivu
district at a cost of about US $42,500. The cost includes
solar panels, too.
About Iyankankulam: 734
families, population 3057. Most people undertake coolie
work. They have been multiply displaced and are very poor.
Thunakai Central Dispensary is 15 km and Mallavi Rural Hospital
is 20 km. There is no bus route to the village most people
use bicycles to travel any distance. During the rainy season
flooding occurs and for 2-3 weeks there is no access to
the village. The current primary health care center is basically
functioning from a temporary house so developing this center
will be of great benefit to this area.
The center will be made up of following areas:
1. Waiting area
2. Office
3. Examination rooms x 2
4. Dispensary
5. Ward with in-patient beds
6. Procedure or labor room
7. Toilet/Bathroom
8. Staff residence
Layout
Cost of Building Iyankankulam
Primary Health Care Center
Capital Cost of buildings:
Building Cost: includes building, electrical,
plumbing, painting, wiring
Stage |
Sq
feet |
|
Total
cost |
| Stage
1a - Core of Community Health Centre building |
980
Sq ft |
@1800Rs/Sq ft |
Rs.
1,764,000
(US$ 18,000)
|
| Stage
1b - Staff accommodation building |
440
Sq ft |
|
Rs.
792,000
(US$ 8,300)
|
| Stage
1c - Well |
|
|
Rs.
100,000
(US$ 1,100) |
| Stage
2- Ward/ Labour Room |
480
Sq ft |
|
Rs.
864,000
(US$ 10,000)
|
| Subtotal
for building |
|
|
Rs.
3,520,000
(US$ 37,400) |
Capital cost of furnishing for stage 1 per centre:
Item |
Cost
perItem |
No.
Required |
Total
Cost |
Cupboard
|
8000Rs |
3 |
24,000Rs |
Table
|
6,000Rs |
5 |
30,000Rs |
| Chairs |
2,000Rs |
15 |
30,000Rs |
Examination
Couch
|
7,000Rs
|
2 |
14,000Rs |
| Dressing
Trolley |
3,000Rs |
1 |
3,000Rs |
| Fan |
8,000Rs |
6 |
48,000Rs |
| IV
Stand |
1,000Rs |
1 |
1,000Rs |
| Shelf |
2000Rs |
2 |
4,000Rs |
| Solar
Panel |
Available |
|
NIL |
| DC
Fridge |
Donated
by |
By TRRO - USA |
NIL |
| 200
Ampere Battery |
|
|
12,000Rs |
| Bicycles |
7,000Rs |
3 |
21,000Rs |
| Steam
Autoclave |
2,500Rs |
1 |
2,500Rs |
| Mosquito
Net |
750Rs |
1 |
750Rs |
| Sub
Total |
|
|
Rs. 190,250
(US$ 2,000) |
Capital Cost of basic medical
equipment:
Item |
Cost
per/Item |
No.
Required |
Total
Cost |
| Stethoscope |
1000Rs |
10 |
10,000Rs |
| Otoscope |
6000Rs |
10 |
60,000Rs |
| Thermometer |
170Rs |
20 |
3,500Rs |
| Anaeroid Sphygmanometer |
1700Rs |
10 |
17,000Rs |
| Volumatic Spacer |
600Rs |
10 |
6,000Rs |
| Volumatic Spacer - baby mask |
300Rs |
10 |
3,000Rs |
| Weight Scale |
700Rs |
10 |
7,000Rs |
| Tape Measure |
20Rs |
10 |
200Rs |
| Nebuliser |
Donated by |
|
NIL |
| Sub Total |
|
|
Rs. 106,700
(US$ 1,100) |
Capital cost of furnishing staff accommodation:
Item |
Cost
per/Item |
No.
Required |
Total
Cost |
| Cupboard |
8000Rs |
2 |
16,000Rs |
| Table |
6,000Rs |
2 |
12,000Rs |
| Chairs |
2,000Rs |
4 |
30,000Rs |
| Dressing Table |
|
2 |
6,000Rs |
| Dining Table & Chairs |
7,500Rs |
1 |
7,500R5 |
| Single Bed |
7,000Rs |
2 |
14,000Rs |
| Fan |
8,000Rs |
3 |
48,000Rs |
| Shelf |
2000Rs |
2 |
4,000Rs |
| Solar Panel |
75,000Rs |
1 |
75,000Rs |
| DC Fridge |
10,000Rs |
1 |
10,000Rs |
| 200 Ampere Battery |
|
|
12,000Rs |
| Bicycles |
7,000Rs |
3 |
21,000Rs |
| Mosquito Net |
750Rs |
2 |
1,500Rs |
| Sub Total |
|
|
Rs. 257,000
(US$ 2,700)
|
Summary of cost
Area
of Expense |
Cost |
| Building cost |
US$ 37,400 |
| Capital cost of furnishing for stage
1 |
US$ 2,000 |
Capital cost of basic medical equipment
|
US$ 1,100 |
| Capital cost of furnishing staff accommodation |
US$ 2,700 |
| Total cost to build a center |
US$ 43,
200 |
Photos
of current Primary Healthcare Center in Iyankankulam
Photos
of construction of the new Primary Healthcare Center
Opening
ceremony of the Iyankankulam medical center on December 29th,
2005
|
|